Post update: Power Advisory as of October 20, 2021; 07:00PM
UNSCHEDULED POWER INTERRUPTION
Affected: Areas covered by Feeder 21-4
Time of interruption: 04:16PM
Power restored: 06:30PM
Cause: Jumper wire cut near Gentuna, Tambler, GSC.
We apologize for the inconvenience this may have caused.
For Information. Thank you.
Previous Post: Power Advisory as of October 20, 2021; 04:40PM
UNSCHEDULED POWER INTERRUPTION
Affected: Areas covered by Feeder 21-4
Time of interruption: 04:16PM
Cause: To be determined
Status: On going line survey to locate the fault.
Remarks: Power will be restored as soon as possible.
We appeal for your utmost understanding. For Information. Thank you.